Enterprise of building materials industry

Workshop for production of panels (Plot number 2), located in Belgorod, street Rabochaya, 14
Detailed information
  • Customer-JSC "Factory of optional equipment and fabricated metal products"
  • The developed documentation - project and working.
  • Project implementation period: 08.12.2010 –24.02.2012
  • Press about object- http://belgorod.bezformata.ru/listnews/novoe-proizvodstvo-sendvich-panelej/3963603. Between end of 2012 and start of 2013 we developed a project to expand the warehouse of finished products. Area increased by 900 m2.
  • At 2013 we developed a project to strengthen the construction of the second floor slab. Bearing capacity increased from 200 to 380 kg/m2.

The building department. Before reconstruction. View from the ABA.

The building department. After reconstruction. View from the ABA.

The building department. Before reconstruction. Within the existing part.

The building department. After reconstruction. Within the existing part.

The building department. Before reconstruction. General view.

The building department. After reconstruction. General view.

 
Industrial Building LLC "Voronezh plant mineral powder", which is located at the Voronezh Region, Novousmansky district, Otradnoe, 750 meters from the M4 highway
Detailed information
  • Customer- JSC "Plant of non-standard equipment and metal products"
  • Developing documentation are working documentations, complete sets of C, .
  • Project implementation period: 01.03.2012-11.04.2012.
  • Press about object- http://vzmp-vrn.ru/fotogalereya/

Inside the production hall

General view of the production hall

The facade of production hall